FHT Process

FHT Process

Streamlining infectious medical waste management protocols

The Complete FHT Operation Workflow

From collection at the ward to final safe disposal, FHT technology streamlines your entire infectious medical waste management protocol. Discover how easy and secure it is to operate our fully automated systems on-site.

Department Collection

Department Collection

Weighing & Handover

Weighing & Handover

On-site Treatment

On-site Treatment

Treatment Completed

Treatment Completed

Transport-Safe Waste

Transport-Safe Waste

Inside the FHT Treatment Cycle

Our friction-based treatment process transforms hazardous infectious medical waste into safe, sterile municipal waste in a matter of minutes. Discover how the cycle works step-by-step.

1

Waste Loading & Pre-shredding

Infectious medical waste is loaded into the treatment chamber either manually or automatically. The heavy-duty rotor immediately begins pre-shredding the materials to optimize surface area.

2

High-Speed Friction & Heating

As the shredding accelerates, the intense mechanical friction generates rapid heating. The temperature inside the chamber steadily climbs toward the sterilization threshold.

3

Sterilization Phase (150°C)

The temperature hits 150°C (302°F). Water contained within the waste vaporizes, creating a moist heat environment. This temperature is maintained to guarantee a 6 Log10 reduction of all pathogens, according to STAAT Level IV criteria.

4

Cooling

Water is injected to rapidly cool the sterile material to a safe handling temperature.

5

Final Output

The dry, unrecognizable residue is automatically discharged. The sterilized material is ready for final disposal, and the machine is prepared for a new cycle.

Key Treatment Metrics

Sterilization Efficacy
6 Log10
According to STAAT Level IV criteria (10⁶ inactivation of B. Stearothermophilus).
Operating Temperature
150°C
Maintained by pure mechanical friction.
Volume Reduction
Up to 80%
Varies depending on waste composition.
Weight Reduction
Up to 30%
Lower storage, transport and disposal costs.
Cycle Time
25 - 35 Min
Rapid processing for high throughput.

Our FHT treatment process strictly complies with international environmental and health regulations, ensuring total safety for both operators and the community.